Over the course of the past few weeks Student Services and all of the college has been busily preparing for August 22nd and beyond. With the number of new students greatly increased over the past, we are very excited. The changes we have been making are incredible. Here are just a few:
- We have converted 41 Essex from an administrative building to a residence hall.
- We have renovated 1A Knowlton so that it will be a much better learning space.
- We have made upgrades in our IT infrastructure and curriculum (more on that in a later blog post).
- We have made two new senior work spaces (still have more work to do with these spaces, but we are on our way).
- And of course, we have a 7 million dollar residence village in place.
Most of all, we are excited for the new year to begin!
Take care,
![]()
Brian Bicknell
Dean of Student Services
Tags: Facilities, Student Life